Siemens 6GK5734-1FX00-0AA0 Retrofit-Ready Managed Switch for SCALANCE XR500 Control Systems
The Siemens 6GK5734-1FX00-0AA0 is a high-performance managed industrial Ethernet switch from the SCALANCE XR500 series, engineered for demanding automation environments where network reliability, deterministic communication, and long service life are non-negotiable. As legacy SCALANCE XR-300 and older XR500 variants reach end-of-life, the 6GK5734-1FX00-0AA0 — also identified as the SCALANCE XR534-8C — has become the preferred retrofit target for system integrators modernizing PROFINET backbones, upgrading ring redundancy topologies, and migrating from older managed switches in control cabinet installations.
This module supports MRP (Media Redundancy Protocol), RSTP, and HSR/PRP ring redundancy, making it directly compatible with existing SIMATIC S7-300, S7-400, and S7-1500 controller architectures without requiring PLC program restructuring. Its modular slot design accommodates a range of media modules, allowing engineers to match existing fiber or copper wiring infrastructure during retrofit without re-cabling the control cabinet.
Upgrade Compatibility Table
| Parameter | Details |
|---|---|
| SKU / Order Number | 6GK5734-1FX00-0AA0 |
| Product Series | SCALANCE XR500 (XR534-8C) |
| Common Replacement For | SCALANCE XR-300 series, XR524-8C, older XR500 variants |
| Mounting / Installation | 19″ rack mount, standard DIN rail adapter available |
| Interface Compatibility | RJ45 + SFP slots; matches legacy copper/fiber wiring layouts |
| Communication Protocols | PROFINET IO, Industrial Ethernet (IE), MRP, RSTP, HSR/PRP, SNMP v1/v2c/v3 |
| Power Supply Input | 24 V DC (redundant input supported); verify existing PSU capacity before swap |
| Backplane / Rack Interface | Standalone chassis; no shared backplane dependency |
| Configuration Migration | Export/import via SINEMA Network Manager or STEP 7 / TIA Portal device config |
| Retrofit Commissioning | IP address reassignment, PROFINET device name re-assignment, ring topology test |
| Warranty | 12 Months — covers hardware defects, DOA replacement, and functional verification |
Retrofit Planning for Existing Automation Systems
A successful retrofit of the 6GK5734-1FX00-0AA0 into an existing SCALANCE XR-300 or early XR500 installation begins with a thorough pre-migration audit. Engineers should document the current switch’s VLAN configuration, port assignments, MRP role (manager or client), and PROFINET device name before powering down. In many legacy installations, the outgoing switch also carries the PROFINET IO controller address assignments for downstream I/O devices — these must be preserved in the TIA Portal project or STEP 7 hardware configuration to avoid I/O address conflicts after the swap.
Power supply verification is critical. The 6GK5734-1FX00-0AA0 draws up to 60 W under full port load. If the existing SITOP PSU8600 or SITOP PSU100S power supply module in the control cabinet was sized for a lower-draw predecessor, a capacity check — and potentially a PSU upgrade — must be completed before commissioning. Redundant 24 V DC feed terminals should be confirmed at the switch’s terminal block, and cable cross-sections verified against the new module’s input current specification.
For fiber-connected segments, the media module slots of the XR534-8C accept standard SFP transceivers compatible with those used in the SCALANCE XR524-8C and SCALANCE X408-2, simplifying fiber patch panel reuse. Copper segments on RJ45 ports are directly compatible with Cat5e/Cat6 structured cabling already installed in the cabinet trunking.
Where the legacy system used a SCALANCE XM408-8C or SCALANCE XM416-4C as the core aggregation switch, the 6GK5734-1FX00-0AA0 can be integrated as a distribution-layer device, preserving the existing ring topology. The CP 343-1 Advanced or CP 443-1 Advanced communication processors in S7-300/400 racks do not require firmware changes when the PROFINET device name and IP address of the new switch are configured to match the outgoing unit exactly.
I/O expansion modules — including ET 200SP and ET 200M distributed I/O stations — connected downstream of the switch will resume normal operation immediately after PROFINET re-establishment, provided device names are correctly assigned. No changes to the PLC’s I/O address table or OB1 program logic are required in a like-for-like swap scenario.
HMI panels such as the SIMATIC TP1200 Comfort or KTP900 Basic connected via Industrial Ethernet will reconnect automatically once the switch is online and the PROFINET ring is closed. Engineers should verify HMI tag communication status in WinCC or TIA Portal after commissioning to confirm all process variables are updating correctly.
Downtime Control During System Migration
Minimizing production downtime during a managed switch replacement requires a structured hot-swap preparation protocol. Before the maintenance window opens, pre-configure the 6GK5734-1FX00-0AA0 offline using SINEMA Network Manager or TIA Portal’s device configuration tool, loading the VLAN tables, port settings, MRP role, and PROFINET device name from the exported configuration of the outgoing unit. This reduces live commissioning time to under 15 minutes in most installations.
During the swap window, the recommended sequence is: (1) notify the SCADA/DCS operator to place the affected loop in manual mode; (2) power down the outgoing switch and disconnect all field cables in labeled order; (3) mount and wire the 6GK5734-1FX00-0AA0, connecting redundant 24 V DC power feeds first; (4) power on and verify the PROFINET ring closes correctly via the switch’s LED indicators or SINEMA dashboard; (5) confirm I/O communication with the PLC before releasing the loop back to automatic mode.
Original PLC program logic — including function blocks, data blocks, and safety interlocks — is fully preserved throughout this process. No program download or CPU restart is required on the SIMATIC S7-1500, S7-400, or S7-300 controller, provided the PROFINET topology is restored within the watchdog timeout configured in the hardware configuration. For installations with tight watchdog settings (under 100 ms), a brief CPU stop/start cycle may be needed to re-establish all IO connections cleanly.
All units supplied by SMARTNEXMSK undergo pre-shipment functional testing including power-on verification, port link testing, and PROFINET device name assignment confirmation. Each unit ships with a 12-month hardware warranty covering manufacturing defects and DOA replacement, with fast dispatch from in-stock inventory.
Retrofit Support FAQ
Q1: Is the 6GK5734-1FX00-0AA0 a direct drop-in replacement for the SCALANCE XR524-8C?
A: Functionally yes for most installations. Both units share the same rack form factor, 24 V DC power input, and PROFINET/MRP support. You will need to reassign the PROFINET device name and IP address to match the outgoing unit. Verify SFP media module compatibility if fiber ports are in use, as some older SFP variants may require substitution.
Q2: Do I need to modify my TIA Portal or STEP 7 project after the swap?
A: In a like-for-like replacement where the PROFINET device name and IP address are preserved, no project changes are required. The PLC will recognize the new switch as the same network device. If you are changing the network topology or adding new ports to the PROFINET configuration, a hardware configuration update and download will be necessary.
Q3: What wiring checks are required before powering on the new switch?
A: Confirm 24 V DC supply voltage at both redundant input terminals (L+ and M), verify cable polarity, and check that all RJ45 and fiber connections are fully seated. Inspect the terminal block torque on the power connector (typically 0.5–0.6 Nm). Confirm the 24 V DC supply capacity covers the full port load of the new switch before energizing.
Q4: What does the 12-month warranty cover?
A: The 12-month warranty covers hardware manufacturing defects, dead-on-arrival (DOA) units, and functional failures under normal operating conditions. Each unit is tested prior to shipment. Warranty claims are processed via [email protected] with proof of purchase. Physical damage caused by incorrect wiring, overvoltage, or improper installation is excluded.