Automation Part • SmartNexMSK Catalog

ABB 1MRK001370-DAr01 Retrofit-Ready I/O Board for REL/REB

ABB 1MRK001370-DAr01 retrofit-ready relay protection I/O board for REL/REB series. Drop-in replacement, tested, 12-month warranty. Fast shipping.

SKU / Model 1MRK001370-DAr01
Brand ABB
Product Type Relay Protection I/O Board
Country of Origin SE
Catalog Category Business & Industrial > Automation, Control & Flow Devices > Programmable Logic Controllers
Model checkSKU and compatibility Quality evidencePhotos on request Export supportPacking and delivery
Description

ABB 1MRK001370-DAr01 Retrofit-Ready I/O Board for REL/REB Overview

ABB 1MRK001370-DAr01 Retrofit-Ready I/O Board for REL/REB Control Systems

The ABB 1MRK001370-DAr01 is a relay protection I/O board engineered for the REL and REB series of numerical protection relays. As aging protection relay platforms approach end-of-life or encounter discontinued spare part availability, the 1MRK001370-DAr01 serves as a critical retrofit component enabling engineers to restore, upgrade, or modernize existing substation automation and feeder protection systems without full panel replacement. Whether you are managing a mid-life refurbishment of a 110 kV feeder bay, replacing a failed I/O board in an active REL316 or REB500 installation, or migrating a legacy protection scheme to a current-generation platform, this board provides the hardware foundation for a controlled, low-risk transition.

SMARTNEXMSK maintains verified stock of the 1MRK001370-DAr01, sourced from authorized channels and subject to full functional testing prior to dispatch. Each unit ships with a 12-month warranty covering manufacturing defects and functional failures under normal operating conditions. Our technical team supports pre-shipment compatibility verification, terminal wiring documentation, and post-installation commissioning guidance.

Upgrade Compatibility Table

Parameter Details
Part Number 1MRK001370-DAr01
Manufacturer ABB (Sweden)
Compatible Series REL316, REL316*4, REB500, REB670, REL670 (verify revision)
Module Function Digital I/O interface board for protection relay binary input/output expansion
Mounting / Installation Rack-mount backplane slot; confirm slot assignment with relay configuration file
Communication Compatibility Internal bus compatible with ABB SPA, LON, and IEC 61850 relay platforms (platform-dependent)
Replacement Recommendation Direct replacement for failed or end-of-life 1MRK001370-DAr01 in REL/REB installations
Commissioning Notes Verify binary input voltage thresholds, output relay ratings, and module address assignment in PCM600 or CAP505
Warranty 12 months from shipment date
Pre-Shipment Testing Full functional test performed; test report available on request

Retrofit Planning for Existing Automation Systems

A successful retrofit of the 1MRK001370-DAr01 begins well before the replacement unit arrives on site. Engineers should retrieve the existing relay configuration from the CAP505 or PCM600 engineering tool and document all binary input assignments, output relay mappings, and module slot addresses currently active in the protection scheme. In REL316 and REL316*4 installations, the I/O board occupies a defined backplane slot, and the slot address must be preserved in the configuration to avoid mismatches that could prevent the relay from entering service after restart.

Terminal wiring is a frequent source of commissioning delay. Before removing the failed board, photograph or document all wiring connections at the I/O terminal block. Confirm the binary input supply voltage — typically 24 VDC, 48 VDC, or 110 VDC depending on the substation DC system — and verify that the replacement board’s input voltage range matches the existing field wiring. Output relay contacts should be checked against the trip circuit design: confirm normally-open or normally-closed contact configuration and the rated breaking capacity for the connected circuit breaker trip coil or alarm circuit.

For installations that include an ABB REL670 or REB670 IED alongside the REL316 platform, engineers should also review the IEC 61850 GOOSE message configuration in PCM600. If the 1MRK001370-DAr01 replacement changes any binary output behavior, the associated GOOSE dataset and subscriber mappings in the station bus configuration may require updating. This is particularly relevant in substations where the protection relay communicates with an ABB RTU560 or a third-party SCADA gateway via IEC 61850 or DNP3.

Power supply capacity is another pre-retrofit checkpoint. The relay rack’s internal power supply — often an ABB PSMV or equivalent 24/48 VDC module — must have sufficient headroom to support the replacement I/O board’s current draw. In older installations where the power supply module itself is approaching end-of-life, it is advisable to replace the power supply simultaneously to avoid a secondary failure shortly after the I/O board retrofit is complete.

Engineers working on multi-bay protection panels should also verify the backplane or rack assembly. In REL316 systems, the ABB COMBIFLEX relay rack or equivalent mounting rail must be inspected for corrosion, loose connectors, or damaged backplane traces before inserting the replacement board. If the rack or backplane shows signs of degradation, a concurrent rack replacement using a compatible ABB RTXP 18 or RTXP 24 test switch assembly may be warranted to ensure long-term reliability.

For sites migrating from REL316 to a current-generation ABB REL670 2.2 or REB670 2.2 IED, the 1MRK001370-DAr01 can serve as an interim solution to maintain protection continuity during a phased migration. In this scenario, the existing REL316 remains in service with the replaced I/O board while the new IED is configured, tested, and staged for cutover. This approach minimizes the protection gap and allows the engineering team to complete the PCM600 configuration, signal list verification, and factory acceptance test of the new IED without time pressure from a live outage window.

HMI and SCADA screen updates should be planned in parallel. If the substation uses an ABB MicroSCADA Pro or a third-party DCS with hardwired alarm inputs from the relay I/O board, any changes to output relay assignments must be reflected in the alarm list and operator display before the replacement unit is energized. Failure to update the HMI can result in misleading alarm indications during the first post-retrofit operational period.

Downtime Control During System Migration

Minimizing protection outage duration is the primary operational constraint in any relay I/O board replacement. The recommended approach is to prepare a complete replacement kit — including the 1MRK001370-DAr01 board, terminal ferrules, wiring labels, and a laptop with CAP505 or PCM600 pre-loaded with the verified configuration file — before the outage window begins. All configuration changes should be completed and validated in the engineering tool offline, so that the on-site work is limited to physical board swap, wiring reconnection, and functional verification.

During the outage, the protection zone covered by the REL316 or REB500 relay must be backed up by adjacent protection or bus protection schemes where available. Coordinate with the system operator to confirm backup protection coverage and agree on the maximum allowable outage duration before the work begins. In most feeder protection applications, a well-prepared team can complete the physical replacement and initial power-on check within 60 to 90 minutes.

After inserting the replacement 1MRK001370-DAr01 and restoring power, perform a binary input injection test using a secondary injection test set to verify that each input channel responds correctly to the applied test voltage. Operate each output relay individually using the relay’s local test mode or the PCM600 test function, and confirm that the connected field device — circuit breaker, alarm annunciator, or intertrip transmitter — responds as expected. Only after all I/O channels have been verified should the relay be returned to service and the protection outage closed.

Document the completed retrofit in the substation maintenance record, including the replaced board’s serial number, the replacement board’s serial number, the configuration file version used, and the names of the engineers who performed and witnessed the work. This documentation supports future maintenance planning and provides traceability for the 12-month warranty period.

Retrofit Support FAQ

Q: Is the 1MRK001370-DAr01 a direct drop-in replacement for the original board in my REL316 installation?
A: In most REL316 and REL316*4 installations, yes. The board occupies the same backplane slot and uses the same terminal wiring layout. However, you should confirm the hardware revision of your existing relay and compare it with the replacement board’s revision marking before installation. SMARTNEXMSK can provide the revision datasheet on request.

Q: What commissioning steps are required after replacing the I/O board?
A: At minimum, perform a binary input injection test for all active input channels, operate each output relay in local test mode, verify the relay configuration file loads without errors, and confirm that the relay enters normal service mode without active hardware fault alarms. For IEC 61850-connected relays, also verify GOOSE subscription status in the station bus engineering tool.

Q: Can I use this board in an REB500 or REB670 installation?
A: The 1MRK001370-DAr01 is primarily associated with the REL316 platform. Compatibility with REB500 or REB670 depends on the specific hardware configuration and backplane design of your installation. Contact our technical team with your relay type, firmware version, and slot configuration, and we will confirm compatibility before shipment.

Q: What does the 12-month warranty cover, and how is it claimed?
A: The warranty covers manufacturing defects and functional failures under normal operating conditions for 12 months from the shipment date. To make a warranty claim, contact [email protected] with the order reference, the board’s serial number, and a description of the failure. We will arrange return shipping and provide a replacement or repair within an agreed lead time.


© 2026 SMARTNEXMSK. All rights reserved.
Original Source: https://smartnexmsk.com
Contact: [email protected] | +86 18259474341

Catalog Paths

Continue from this exact model

Use the live catalog paths below to compare the same brand, product type, or series before sending your RFQ.

RFQ Intent Desk

Choose the right sourcing path for this model

Each action carries the product model and intent into the inquiry record so the sales follow-up starts with useful context.

Exact Model Quote

Use this path when the SKU, brand, quantity, and destination are already confirmed.

Start
Replacement Check

Use this path for old, obsolete, or uncertain models that need compatibility review.

Start
Quality Confirmation

Ask for label photos, packing notes, documentation, or pre-shipment checks.

Start
Urgent Dispatch

Route downtime or maintenance requests with target dispatch timing and courier country.

Start
Request Quote WhatsApp Email