ABB SACE-PR111/P Retrofit-Ready Trip Unit for Emax Control Systems
The ABB SACE-PR111/P is a microprocessor-based electronic trip unit engineered for direct retrofit into ABB Emax series low-voltage air circuit breakers. Designed to replace aging or discontinued protection relays in legacy switchgear panels, the SACE-PR111/P delivers precise overload (L), short-circuit (S), and instantaneous (I) protection functions while maintaining full mechanical and electrical compatibility with the original Emax frame. For facilities managing aging MCC cabinets, main distribution boards, or motor control centers built around the Emax platform, this unit provides a validated, cost-effective path to modernization without requiring full breaker replacement.
Whether you are upgrading a single feeder breaker or executing a plant-wide protection coordination study, the SACE-PR111/P integrates seamlessly into existing Emax E1, E2, E3, E4, and E6 frames. Its plug-in architecture eliminates the need for panel rewiring, and the retained trip characteristic settings reduce re-commissioning time significantly. Engineers responsible for arc flash hazard analysis will appreciate the consistent and repeatable trip curves that simplify IEEE 1584 coordination documentation.
Upgrade Compatibility Table
| Parameter | Details |
|---|---|
| Compatible Breaker Frames | ABB Emax E1, E2, E3, E4, E6 (1st & 2nd generation) |
| Replaces / Supersedes | PR111/P (original), PR112/P (partial), legacy analog trip units |
| Protection Functions | L (overload), S (short-circuit delay), I (instantaneous) |
| Mounting Interface | Plug-in, tool-free extraction — no panel rewiring required |
| Communication Compatibility | Standalone (no bus); upgrade to PR122/P or PR123/P for MODBUS/Profibus |
| Rated Current Range | In = 0.4 × In to 1 × In (set via front DIP switches) |
| Auxiliary Power | Self-powered from CT; no external 24 VDC supply required |
| Installation Requirement | Verify breaker cradle release lever and trip bar alignment before insertion |
| Commissioning Note | Confirm In setting, L/S/I thresholds, and perform test trip via TEST button |
| Warranty | 12 months from shipment date — covers manufacturing defects |
Retrofit Planning for Existing Automation Systems
A successful retrofit begins well before the SACE-PR111/P arrives on site. Start by auditing the existing Emax breaker nameplate to confirm the frame size (E1N, E2N, E3N, E4H, or E6H) and the rated current In. Cross-reference the original trip unit label — units marked PR111/P or earlier analog types are direct candidates for this replacement. If the panel also houses an ABB PR010/T test unit, retain it; it remains compatible and is essential for post-installation functional testing without energizing the main bus.
For panels where the Emax breaker feeds a downstream ABB ACS880 or ACS580 variable frequency drive, verify that the S-function (short-circuit delay) is set to coordinate with the drive’s input fuse rating. Miscoordination here is a common source of nuisance tripping during motor start sequences. Similarly, if the breaker is the incomer to a ABB MNS or UniGear switchgear assembly, the protection settings must be coordinated with the upstream utility relay — typically a REF615 or REF630 feeder protection relay — to maintain selectivity.
Panels that previously relied on a PR122/P or PR123/P trip unit with MODBUS RTU or Profibus DP communication should note that the PR111/P does not include a communication module. If remote monitoring via a SCADA system or ABB Ability Energy Manager is required, plan to upgrade to the PR122/P instead, or install a separate CM-UFD.M22 communication module on the breaker. For sites where communication is not a requirement, the PR111/P is the most cost-efficient protection-only solution.
When the panel also contains ABB S800 or S200 series MCBs on outgoing feeders, ensure the discrimination study accounts for the new PR111/P trip curves. The I-function threshold on the PR111/P should be set at a minimum of 1.5× the highest downstream MCB instantaneous trip level to guarantee full selectivity. Document all settings on the panel schedule before energization.
For control cabinets integrating an ABB AC500 PLC or ABB Freelance DCS, the breaker status (open/closed/tripped) is typically wired to a digital input module via the Emax auxiliary contact block. Confirm that the existing SK1 or SK2 auxiliary contact wiring is intact and that the PLC program logic correctly interprets the trip signal — particularly if the original trip unit had a different fault output relay configuration. Update the HMI faceplate on any ABB CP600 or CP400 panel PC to reflect the new trip unit model number and revised alarm setpoints.
Downtime Control During System Migration
Minimizing production downtime during a trip unit swap requires a structured outage plan. The SACE-PR111/P replacement procedure is typically completed within 15–30 minutes per breaker under controlled conditions, but the surrounding preparation — isolation, permit-to-work, and post-installation testing — typically extends the total outage window to 2–4 hours per panel section.
Before the outage window opens, pre-configure the replacement PR111/P with the identical In, L, S, and I settings from the outgoing unit. Use the ABB PR010/T test unit to perform a bench-level trip test on the new module before it enters the panel. This eliminates the risk of discovering a configuration error after the panel is re-energized. Photograph the existing wiring, auxiliary contact positions, and DIP switch settings as a reference baseline.
During the outage, extract the old trip unit using the front-panel release lever — no tools required. Insert the SACE-PR111/P, confirm the mechanical latch engagement, and verify the trip bar is correctly seated. Re-check all auxiliary contact wiring to the PLC digital input module. Perform a manual trip test using the TEST button before closing the breaker. Log the as-left settings on the panel schedule and update the maintenance management system (CMMS) record.
For critical feeders where even a 2-hour outage is unacceptable, consider a planned maintenance window during a scheduled production shutdown, or arrange a temporary bypass feeder from an adjacent panel section. In either case, ensure the original program logic in the AC500 PLC or Freelance DCS controller is backed up before the outage begins. Retain the removed trip unit as a spare until the replacement has completed a full operational cycle — typically 30 days — to provide a fallback option if unexpected behavior is observed.
Retrofit Support FAQ
Q1: Is the SACE-PR111/P a direct drop-in replacement for the original PR111/P in all Emax frame sizes?
Yes. The SACE-PR111/P uses the same plug-in mechanical interface across all Emax E1–E6 frame sizes. No adapter plate or wiring modification is required. Confirm the breaker generation (1st or 2nd gen Emax) from the nameplate before ordering to ensure the correct variant.
Q2: Can the PR111/P replace a PR122/P or PR123/P that has a failed communication module?
Yes, as a protection-only fallback. The PR111/P will restore L/S/I protection functions immediately. However, it does not support MODBUS RTU, Profibus DP, or IEC 61850 communication. If remote monitoring or energy metering is required, the PR122/P is the correct long-term replacement.
Q3: What commissioning steps are mandatory after installation?
Verify the In DIP switch setting matches the breaker rated current. Confirm L, S, and I thresholds against the protection coordination study. Perform a trip test using the PR010/T test unit or the front-panel TEST button. Record as-left settings and update the panel schedule. Notify the SCADA/DCS operator of the maintenance window closure.
Q4: What does the 12-month warranty cover, and what is the return process?
The 12-month warranty covers manufacturing defects in materials and workmanship from the shipment date. Units that fail under normal operating conditions within the warranty period are eligible for replacement or repair at no charge. Contact [email protected] with the order number and fault description to initiate an RMA. Units showing evidence of incorrect installation, overvoltage, or physical damage are excluded from warranty coverage.