Automation Part • SmartNexMSK Catalog

ABB SM560-S 1SAP280000R0001 Maintenance-Ready Spare AC500-S

ABB SM560-S 1SAP280000R0001 original AC500-S Safety CPU spare. SIL3-rated, drop-in replacement, tested before dispatch, 12-month warranty. Fast global shipping.

SKU / Model SM560-S 1SAP280000R0001
Brand ABB
Product Type Safety PLC CPU Module
Series AC500
Country of Origin SE
Catalog Category Business & Industrial > Automation, Control & Flow Devices > Programmable Logic Controllers
Model checkSKU and compatibility Quality evidencePhotos on request Export supportPacking and delivery
Description

ABB SM560-S 1SAP280000R0001 Maintenance-Ready Spare AC500-S Overview

ABB SM560-S 1SAP280000R0001 Maintenance-Ready Spare AC500-S: Spare Parts Replacement & Industrial Downtime Risk Control

The ABB SM560-S (catalog number 1SAP280000R0001) is the Safety CPU module at the heart of ABB’s AC500-S Safety PLC platform — a SIL 3 / PLe-rated controller widely deployed in process safety, machine guarding, emergency shutdown (ESD), and fire & gas detection systems. When this module fails or reaches end-of-service life, the entire safety loop is compromised. Holding a verified, tested spare on the shelf is not optional for any facility running a safety-instrumented system (SIS) — it is a fundamental element of functional safety management and IEC 61511 compliance.

This listing supplies the SM560-S as an original, factory-sourced spare part, fully tested before dispatch and backed by a 12-month warranty. Each unit is verified for firmware compatibility, communication integrity, and I/O response before it leaves our facility. We maintain long-term stock to support both planned maintenance windows and emergency callouts, with same-day or next-business-day dispatch available for in-stock units.

Spare Maintenance Table

Parameter Specification / Detail
Part Number / SKU SM560-S  |  1SAP280000R0001
Brand ABB
Series AC500-S Safety PLC
Module Type Safety CPU Module
Safety Integrity Level SIL 3 (IEC 61508) / PLe (ISO 13849)
Supply Voltage 24 V DC (via PM5xx Power Supply Module)
Communication Interfaces PROFIBUS DP, CANopen, Modbus RTU/TCP (via CM modules)
Max. Safety I/O Up to 2,048 safety I/O points (with SM560-S expansion)
Program Memory 4 MB user program memory
Operating Temperature 0 °C to +60 °C
Protection Rating IP20 (panel-mount, DIN rail)
Origin Germany (DE)
Compatibility AC500-S backplane, TB5xx terminal bases, PM5xx power modules
Certifications TÜV Rheinland, CE, cULus
Warranty 12 Months — tested before dispatch
Condition Original spare — new or refurbished-to-spec, clearly stated at order
Dispatch Same-day / next business day for in-stock units

Maintenance Planning for Continuous Operation

Replacing the SM560-S in a live safety system is a structured, multi-discipline task. Maintenance engineers and procurement teams should treat this module replacement as a trigger for a broader cabinet inspection. The SM560-S does not operate in isolation — it depends on a tightly integrated set of components, and a failure in any one of them can mask or mimic a CPU fault.

Begin with the PM583-ETH or PM591 Power Supply Module: verify output voltage is stable at 24 V DC ±1% under load. A degraded power supply is one of the most common root causes of intermittent CPU faults and should be replaced proactively if it has been in service for more than five years. Next, inspect the TB5600 or TB5610 Terminal Base on which the SM560-S is mounted — check for oxidized contacts, loose DIN rail clips, and any signs of thermal stress on the connector pins.

For safety I/O, audit the SM560-S paired SM560 standard CPU if your system uses a dual-CPU architecture, and verify that both CPUs are running matched firmware versions. Mismatched firmware between the safety and standard CPUs is a common post-replacement commissioning error. Check all DI581-S and DO581-S Safety Digital I/O Modules for correct channel diagnostics — a module with a latent fault may only surface during the proof-test cycle triggered by a CPU swap.

Communication continuity is equally critical. If the system uses CM589-PNIO PROFINET or CM578-CN CANopen Communication Modules, verify that the new SM560-S has been configured with the correct node address and baud rate before going live. For systems with Modbus TCP or serial Modbus RTU links to a DCS or SCADA, confirm that the IP address and slave ID are correctly restored from the project backup.

Do not overlook the signal isolators and safety relays in the output loop. Components such as Phoenix Contact MACX or Pepperl+Fuchs KFD series isolators in the field wiring cabinet should be inspected for drift and response time. Similarly, any safety relay modules (e.g., ABB SR series or Pilz PNOZ) in the final element circuit should be proof-tested in conjunction with the CPU replacement to satisfy the SIS proof-test interval requirements.

Finally, if the system includes an ABB CP600 or CP620 HMI panel connected to the AC500-S via Ethernet, verify that the HMI project is compatible with the firmware version loaded on the replacement SM560-S. Firmware mismatches between the HMI and CPU can cause communication timeouts that are difficult to diagnose without a full system test.

Site Replacement Workflow

Step 1 — Pre-replacement documentation: Export the current project from Automation Builder, record all IP addresses, node IDs, and I/O force states. Photograph the wiring and label all field cables before disconnection.

Step 2 — Safe state confirmation: Coordinate with the process safety engineer to confirm the SIS is in a safe state or that a bypass is authorized per the Management of Change (MOC) procedure. Do not remove the SM560-S while the safety function is active without a formal bypass in place.

Step 3 — Module swap: Remove the faulty SM560-S from the TB5600 terminal base. Seat the replacement unit firmly until the locking tab clicks. The terminal base retains all field wiring, so no rewiring is required — this is a key advantage of the AC500-S modular architecture and significantly reduces replacement time compared to older hardwired relay-based safety systems.

Step 4 — Firmware and project restore: Connect via USB or Ethernet to Automation Builder. Download the validated project file. Verify that the firmware version on the replacement module matches the project requirements — update if necessary before downloading the application.

Step 5 — Functional test: Perform a full proof test of all safety functions before returning the system to automatic mode. Document the test results and update the SIS maintenance log. Notify the process control room that the bypass has been lifted.

This workflow typically allows a trained maintenance engineer to complete a planned SM560-S replacement in under two hours, minimizing process downtime and maintaining full audit traceability.

Spare Parts Support FAQ

Q1: Is this SM560-S (1SAP280000R0001) a new or refurbished unit?
We supply both new and refurbished-to-specification units depending on availability. The condition is clearly stated at the time of order confirmation. All refurbished units undergo full functional testing, firmware verification, and safety diagnostic checks equivalent to new-unit acceptance criteria. The 12-month warranty applies equally to both conditions.

Q2: How do I verify compatibility with my existing AC500-S system before ordering?
Share your current project’s Automation Builder version, the firmware version of your existing SM560-S, and the terminal base model (TB5600 or TB5610). Our technical team will confirm compatibility and advise on any firmware update requirements before dispatch. We can also cross-reference your system’s hardware configuration report if you can export it from Automation Builder.

Q3: What is your lead time for the SM560-S, and do you hold safety stock?
For in-stock units, dispatch is same-day or next business day. We maintain a dedicated safety stock buffer for high-demand AC500-S modules including the SM560-S, SM560, DI581-S, and DO581-S to support emergency callouts. For planned maintenance, we recommend ordering at least 4–6 weeks ahead of your scheduled proof-test window to allow for incoming inspection and any firmware pre-loading you require.

Q4: What does the 12-month warranty cover, and what is the claims process?
The 12-month warranty covers manufacturing defects, premature component failure, and any fault that arises under normal operating conditions within the module’s rated environmental and electrical specifications. It does not cover damage from incorrect installation, overvoltage, or unauthorized modification. To initiate a warranty claim, contact us with the order number, a description of the fault, and any diagnostic data from Automation Builder. We will arrange return shipping and provide a replacement or repair within an agreed lead time.


© 2026 SMARTNEXMSK. All rights reserved.
Original Source: https://smartnexmsk.com
Contact: [email protected] | +86 18259474341

Catalog Paths

Continue from this exact model

Use the live catalog paths below to compare the same brand, product type, or series before sending your RFQ.

RFQ Intent Desk

Choose the right sourcing path for this model

Each action carries the product model and intent into the inquiry record so the sales follow-up starts with useful context.

Exact Model Quote

Use this path when the SKU, brand, quantity, and destination are already confirmed.

Start
Replacement Check

Use this path for old, obsolete, or uncertain models that need compatibility review.

Start
Quality Confirmation

Ask for label photos, packing notes, documentation, or pre-shipment checks.

Start
Urgent Dispatch

Route downtime or maintenance requests with target dispatch timing and courier country.

Start
Request Quote WhatsApp Email