Automation Part SmartNexMSK Catalog

JASCO SCF-VCH-BP TAB22A-4/PURF2-LF Retrofit-Ready Valve Change Unit

JASCO SCF-VCH-BP TAB22A-4/PURF2-LF retrofit-ready 6-valve change unit. Drop-in replacement for SFC systems. Compatibility verified, 12-month warranty and.

SKUSCF-VCH-BP TAB22A-4/PURF2-LF W/ 2L81-000001-14 2L81-050039-41 396uW, 4022.454.71615 5517D-C19 6
BrandJASCO
SeriesOther series
JASCO SCF-VCH-BP TAB22A-4/PURF2-LF W/ 2L81-000001-14 2L81-050039-41 396uW, 4022.454.71615 5517D-C19 6 Valve Change Unit
Model context is attached to every quote action. Use WhatsApp for urgent downtime, or Email for purchasing records.
Model checkSKU and compatibility review Quality evidencePhotos and label notes when available Export supportPacking, courier, and delivery notes
Product Information

Model Details

SKU / Model SCF-VCH-BP TAB22A-4/PURF2-LF W/ 2L81-000001-14 2L81-050039-41 396uW, 4022.454.71615 5517D-C19 6
Brand JASCO
Product Type Valve Change Unit
Series Other series
Catalog Category Business & Industrial > Automation, Control & Flow Devices
Tags JASCO, Retrofit Replacement, SCF-VCH-BP, SFC System, Valve Change Unit
Catalog Paths

Continue from this exact model

Use the live catalog paths below to compare the same brand, product type, or series before sending your RFQ.

RFQ Intent Desk

Choose the right sourcing path for this model

Each action carries the product model and intent into the inquiry record so the sales follow-up starts with useful context.

Exact Model Quote

Use this path when the SKU, brand, quantity, and destination are already confirmed.

Start
Replacement Check

Use this path for old, obsolete, or uncertain models that need compatibility review.

Start
Quality Confirmation

Ask for label photos, packing notes, documentation, or pre-shipment checks.

Start
Urgent Dispatch

Route downtime or maintenance requests with target dispatch timing and courier country.

Start
Description

JASCO SCF-VCH-BP TAB22A-4/PURF2-LF Retrofit-Ready Valve Change Unit Overview

JASCO SCF-VCH-BP TAB22A-4/PURF2-LF Retrofit-Ready Valve Change Unit for SFC Control Systems

The JASCO SCF-VCH-BP TAB22A-4/PURF2-LF is a precision 6-valve change unit engineered for supercritical fluid chromatography (SFC) systems. Designed as a retrofit-ready replacement, this unit supports smooth migration from legacy JASCO SFC platforms to current-generation control architectures without requiring full system overhaul. Whether you are restoring a discontinued analytical line, upgrading aging fluid-path hardware, or expanding an existing SFC installation, this valve change unit delivers verified compatibility, reduced downtime, and a 12-month warranty backed by in-stock inventory.

The SCF-VCH-BP assembly integrates directly with JASCO’s SFC-series fluid management architecture. The TAB22A-4/PURF2-LF valve configuration supports back-pressure regulation and mobile-phase switching functions critical to gradient SFC separations. Associated sub-components including the 2L81-000001-14 and 2L81-050039-41 assemblies, along with the 396uW flow cell interface, 4022.454.71615 fitting set, and 5517D-C19 connector harness, are incorporated into the complete unit to ensure a fully validated drop-in replacement experience.

Upgrade Compatibility Table

Parameter Details
SKU SCF-VCH-BP TAB22A-4/PURF2-LF W/ 2L81-000001-14 2L81-050039-41 396uW, 4022.454.71615 5517D-C19 6
Brand / Origin JASCO / Japan
Unit Type 6-Valve Change Unit (Back-Pressure / Mobile Phase)
Series Compatibility JASCO SFC-series (X-LC, SF-2000, SF-3000 platform lineage)
Interface / Mounting Standard JASCO SFC fluid-path bracket; direct backplane connection
Communication Compatible with JASCO ChromNAV and legacy LC-Net II/ADC control software
Replacement Scope Drop-in for discontinued SCF-VCH-BP variants; sub-component matched
Commissioning Notes Verify back-pressure setpoint, purge sequence, and valve address in ChromNAV method editor before first run
Warranty 12 Months — covers valve actuation, sealing integrity, and electrical interface

Retrofit Planning for Existing Automation Systems

Retrofitting an SFC system around the SCF-VCH-BP TAB22A-4/PURF2-LF requires a structured approach to hardware mapping and software re-validation. Begin by auditing the existing fluid path: confirm that the JASCO PU-2080-CO2 or PU-4180-CO2 pump module is delivering the correct supercritical CO₂ flow rate and that the back-pressure regulator — typically a JASCO BP-2080-Plus or BP-4030 — is calibrated to the target outlet pressure before installing the new valve unit.

On the fluid-path side, inspect all PEEK tubing connections and replace any fittings from the 4022.454.71615 series that show signs of stress cracking or CO₂ permeation. The 2L81-000001-14 inlet manifold sub-assembly and 2L81-050039-41 outlet block must be torqued to JASCO specification to prevent micro-leaks under supercritical conditions. The 396uW UV flow cell interface downstream of the valve unit should be leak-tested at operating pressure before resuming analytical runs.

For systems running the JASCO MD-2018 or MD-4010 multi-wavelength detector, verify that the detector’s flow cell pressure rating is compatible with the new valve unit’s back-pressure profile. If the installation includes a JASCO AS-4150 autosampler, confirm that the injection valve timing sequence in the ChromNAV method file is updated to reflect the new valve change unit’s actuation delay parameters.

Electrical integration requires confirming that the 5517D-C19 connector harness seats correctly into the SFC system’s I/O backplane. Check the valve address assignment in the ChromNAV instrument configuration panel — mismatched addresses are the most common cause of valve-not-responding errors during initial commissioning. If the system uses a JASCO LC-Net II/ADC interface module for legacy communication, ensure firmware is updated to recognize the TAB22A-4 valve table before running the first gradient method.

For installations involving a JASCO CO-4060 column oven, verify that the column switching valve — if present — is mapped independently from the SCF-VCH-BP unit to avoid address conflicts on the shared control bus. All pre-installation checks, including valve actuation counts, seal condition, and flow-path pressure hold tests, are completed at our facility prior to shipment. Each unit ships with a test report confirming functional verification under simulated SFC operating conditions.

Downtime Control During System Migration

Minimizing analytical downtime during an SFC valve unit replacement requires pre-staging all replacement hardware and validating the new unit offline before the scheduled maintenance window. Request the SCF-VCH-BP TAB22A-4/PURF2-LF unit in advance and perform a bench-level actuation test using a portable valve driver or the JASCO service utility to confirm all six valve positions respond correctly before the system is taken offline.

Back up the existing ChromNAV instrument configuration file and all active method sets before disconnecting the legacy valve unit. Document the current valve address assignments, back-pressure setpoints, and purge sequence parameters so they can be restored exactly after installation. If the system is running time-sensitive analytical batches, coordinate the replacement during a scheduled column equilibration or solvent changeover period to reduce the impact on throughput.

During installation, replace the valve unit without disturbing the CO₂ supply line or the modifier pump connections unless a full fluid-path inspection is also planned. After mechanical installation, perform a system leak test at 10% above operating back-pressure before re-enabling the pump. Restore the ChromNAV configuration from backup, verify valve address mapping, and run a single-point qualification injection with a known standard before returning the system to production use. With proper pre-staging, total system downtime for a valve unit replacement is typically under four hours.

Retrofit Support FAQ

Q1: Is the SCF-VCH-BP TAB22A-4/PURF2-LF a direct replacement for my existing JASCO SFC valve unit?
Yes. This unit is configured as a drop-in replacement for discontinued SCF-VCH-BP variants used in JASCO SFC-series systems. The sub-component set — including the 2L81-000001-14, 2L81-050039-41, 396uW flow cell interface, 4022.454.71615 fittings, and 5517D-C19 harness — is matched to the original assembly specification. Confirm your system’s valve address and back-pressure setpoint before installation.

Q2: What commissioning steps are required after installation?
After mechanical installation and leak testing, open ChromNAV and navigate to the instrument configuration panel. Verify that the valve change unit is recognized at the correct address. Run the valve purge sequence to clear any air from the fluid path, then perform a pressure hold test at operating back-pressure. Execute a qualification injection with a certified reference standard before resuming production runs.

Q3: Can this unit be used with legacy JASCO LC-Net II/ADC communication interfaces?
Yes, provided the LC-Net II/ADC firmware is updated to support the TAB22A-4 valve table. Contact your JASCO service representative or our technical support team to confirm firmware compatibility before installation if your system is running an older LC-Net II/ADC version.

Q4: What does the 12-month warranty cover?
The 12-month warranty covers valve actuation mechanism integrity, fluid-path sealing performance, and the electrical interface harness under normal SFC operating conditions. Each unit is functionally tested and ships with a pre-shipment test report. Warranty claims are supported directly — contact sales@smartnexmsk.com with your order reference and a description of the issue.


© 2026 SMARTNEXMSK. All rights reserved.
Original Source: https://smartnexmsk.com
Contact: sales@smartnexmsk.com | +86 18259474341

Request Quote WhatsApp Email