Automation Part SmartNexMSK Catalog

MILLIPORE TYLAN FC-2911V H2 30SLM Spare FC-2900

Original MILLIPORE TYLAN FC-2911V H2 30SLM DC01333002 spare for FC-2900 series. Industrial MFC replacement, 12-month warranty, fast shipping.

SKUFC-2911V H2 30SLM DC01333002
BrandMILLIPORE TYLAN
SeriesOther series
MILLIPORE TYLAN FC-2911V H2 30SLM DC01333002 Mass Flow Controller
Model context is attached to every quote action. Use WhatsApp for urgent downtime, or Email for purchasing records.
Model checkSKU and compatibility review Quality evidencePhotos and label notes when available Export supportPacking, courier, and delivery notes
Product Information

Model Details

SKU / Model FC-2911V H2 30SLM DC01333002
Brand MILLIPORE TYLAN
Product Type Mass Flow Controller
Series Other series
Catalog Category Business & Industrial > Automation, Control & Flow Devices > Programmable Logic Controllers
Tags FC-2900, industrial spare, mass flow controller, MFC replacement, MILLIPORE TYLAN
Catalog Paths

Continue from this exact model

Use the live catalog paths below to compare the same brand, product type, or series before sending your RFQ.

RFQ Intent Desk

Choose the right sourcing path for this model

Each action carries the product model and intent into the inquiry record so the sales follow-up starts with useful context.

Exact Model Quote

Use this path when the SKU, brand, quantity, and destination are already confirmed.

Start
Replacement Check

Use this path for old, obsolete, or uncertain models that need compatibility review.

Start
Quality Confirmation

Ask for label photos, packing notes, documentation, or pre-shipment checks.

Start
Urgent Dispatch

Route downtime or maintenance requests with target dispatch timing and courier country.

Start
Description

MILLIPORE TYLAN FC-2911V H2 30SLM Spare FC-2900 Overview

MILLIPORE TYLAN FC-2911V H2 30SLM Spare FC-2900: Precision MFC Replacement for Industrial Downtime Control

The MILLIPORE TYLAN FC-2911V (SKU: FC-2911V H2 30SLM DC01333002) is an original-specification mass flow controller engineered for hydrogen (H₂) gas service at a rated full-scale flow of 30 SLPM. As a direct maintenance-ready spare for the FC-2900 series, this unit is stocked and tested to support rapid field replacement in semiconductor fabrication, chemical vapor deposition (CVD), and precision gas-blending systems where unplanned downtime carries significant production cost.

Maintenance engineers and procurement teams operating FC-2900 series gas panels understand that a single failed MFC can halt an entire process line. Sourcing a verified, calibrated spare in advance — rather than waiting for an emergency — is the cornerstone of any credible preventive maintenance strategy. The FC-2911V is supplied with factory-traceable calibration data, pre-shipment leak and flow verification, and a 12-month warranty covering both parts and workmanship.

Spare Maintenance Table

Parameter Specification
Part Number / SKU FC-2911V H2 30SLM DC01333002
Brand / OEM MILLIPORE TYLAN
Series FC-2900
Product Type Mass Flow Controller (MFC)
Gas Service Hydrogen (H₂)
Full-Scale Flow Rate 30 SLPM (Standard Liters Per Minute)
Valve Type Normally Closed (NC) Proportional Solenoid
Control Signal 0–5 VDC / 4–20 mA (configurable)
Power Supply ±15 VDC, 24 VDC (per system configuration)
Wetted Materials 316L SS body, Viton / Kalrez seals (H₂ compatible)
Process Connection VCR face-seal fittings (1/4″)
Operating Pressure Up to 100 psig inlet
Accuracy ±1% FS (full scale)
Repeatability ±0.2% FS
Operating Temperature 0°C to 50°C ambient
Compatibility Direct drop-in for FC-2900 series gas panels
Origin USA (OEM)
Warranty 12 Months — Parts & Workmanship
Pre-Shipment Testing Flow calibration, leak test, functional verification
Shipping ESD-safe packaging; DHL / FedEx express available

Maintenance Planning for Continuous Operation

When scheduling a planned replacement of the FC-2911V in an FC-2900 gas panel, a thorough maintenance engineer will not stop at the MFC itself. The surrounding gas-delivery circuit should be inspected and, where appropriate, refreshed concurrently to avoid a repeat shutdown within the same maintenance window.

Begin upstream: verify the FC-2900 series 24 VDC power supply module output voltage under load. A sagging supply rail is a common root cause of MFC drift and premature valve wear. Inspect the D-sub 15-pin signal cable connecting the MFC to the gas panel controller — pin corrosion or intermittent contact can produce erratic flow readings that are frequently misdiagnosed as MFC failure. Check the FC-2900 I/O interface board for burnt traces or failed analog output channels before commissioning the replacement unit.

Within the same gas stick, inspect the upstream manual isolation valve and the downstream check valve for seat wear or particulate contamination — both are common failure points in H₂ service. The pressure transducer mounted on the inlet manifold should be zero-checked; a drifted transducer will cause the new MFC to be calibrated against an incorrect reference pressure. If the system uses a TYLAN FC-2900 series purge valve or vent valve assembly, confirm solenoid coil resistance and verify that the valve opens fully at rated voltage.

On the control side, review the FC-2900 multi-channel readout/control unit (or equivalent PLC analog I/O card) setpoint and range configuration to confirm it matches the 30 SLPM full-scale calibration of the replacement FC-2911V. If the facility uses a signal isolator or barrier module between the MFC and the DCS/PLC, verify isolation integrity and output scaling. Finally, inspect the VCR gasket at both process connections — always replace gaskets during an MFC swap; reusing a compressed gasket is a leading cause of post-maintenance H₂ leaks.

Stocking a secondary FC-2911V alongside a spare FC-2900 power supply, a set of VCR gaskets, and a replacement D-sub signal cable gives maintenance teams a complete emergency kit capable of restoring gas-panel operation within a single shift.

Site Replacement Workflow

Step 1 — Isolation & Purge: Close upstream manual isolation valve. Purge the gas stick with inert gas (N₂) per site safety procedure. Confirm H₂ concentration at zero with a portable gas detector before breaking any fittings.

Step 2 — Signal Disconnection: Label and disconnect the D-sub 15-pin signal cable and the 24 VDC power connector. Record the setpoint value displayed on the readout unit before powering down.

Step 3 — Mechanical Removal: Loosen VCR nuts at inlet and outlet. Remove the FC-2911V from the gas stick. Inspect the manifold ports for contamination or scoring.

Step 4 — Gasket & Fitting Prep: Install new VCR gaskets (316 SS or nickel, per process spec). Torque VCR nuts to manufacturer specification — typically 1/8 turn past finger-tight for 1/4″ VCR.

Step 5 — Installation & Leak Check: Mount the replacement FC-2911V. Reconnect signal cable and power. Perform a pressurized leak check with inert gas before introducing H₂. Use an electronic leak detector at all fittings.

Step 6 — Commissioning: Restore H₂ supply slowly. Enter the original setpoint on the readout/control unit. Verify actual flow against setpoint using a secondary reference flow meter if available. Allow 15–30 minutes for thermal stabilization before recording baseline flow data.

Step 7 — Documentation: Log the replacement in the equipment maintenance record: date, technician, old unit serial number, new unit serial number (DC01333002), post-installation leak-check result, and baseline flow reading. Retain the removed FC-2911V for failure analysis or refurbishment evaluation.

This workflow minimizes H₂ exposure risk, ensures calibration traceability, and reduces total replacement time to under two hours for a trained technician — keeping process downtime within a single planned maintenance window.

Spare Parts Support FAQ

Q1: Is the FC-2911V H2 30SLM DC01333002 a direct drop-in replacement for other FC-2900 series units?
The FC-2911V is mechanically and electrically compatible with the FC-2900 series gas panel platform. However, full-scale flow range and gas calibration are model-specific. Confirm that the replacement unit’s gas type (H₂) and full-scale range (30 SLPM) match the original specification before installation. Substituting a unit calibrated for a different gas or range without recalibration will produce inaccurate flow delivery.

Q2: What pre-shipment testing is performed, and how is calibration traceability documented?
Each FC-2911V unit undergoes flow calibration against a NIST-traceable reference standard, a full-scale linearity check, a helium leak test at rated inlet pressure, and a functional valve-response test. A calibration certificate with as-found and as-left data is included with shipment. Units are packed in ESD-safe, nitrogen-purged bags to preserve internal cleanliness during transit.

Q3: What does the 12-month warranty cover, and what is the RMA process?
The 12-month warranty covers manufacturing defects, calibration drift beyond published accuracy specifications, and valve or sensor failures under normal operating conditions. It does not cover damage from incorrect gas service, over-pressure events, or improper installation. To initiate an RMA, contact sales@smartnexmsk.com with the unit serial number, purchase date, and a description of the observed fault. Replacement or repair turnaround is typically 5–10 business days.

Q4: How should the FC-2911V be stored if purchased as a long-term inventory spare?
Store in the original ESD-safe packaging in a clean, dry environment at 15°C–30°C with relative humidity below 60%. Keep VCR port caps installed to prevent contamination of wetted surfaces. Inspect the unit annually: verify valve actuation by applying rated control voltage and confirm zero-flow leak integrity. Units stored under these conditions maintain calibration validity for up to 24 months; recalibration is recommended before installation if storage exceeds this period.


© 2026 SMARTNEXMSK. All rights reserved.
Original Source: https://smartnexmsk.com
Contact: sales@smartnexmsk.com | +86 18259474341

Request Quote WhatsApp Email