Automation Part • SmartNexMSK Catalog

Allen-Bradley 1336-PB-SP2C Retrofit-Ready Power Base for 1336 PLUS

Allen-Bradley 1336-PB-SP2C (74101-502-57) retrofit-ready power base board for 1336 PLUS VFD. Drop-in replacement, 12-month warranty, stock available.

SKU / Model 1336-PB-SP2C 74101-502-57
Brand Allen-Bradley
Product Type Power Base Board
Country of Origin US
Catalog Category Business & Industrial > Automation, Control & Flow Devices > Industrial Control Systems > Variable Frequency Drives
Model checkSKU and compatibility Quality evidencePhotos on request Export supportPacking and delivery
Description

Allen-Bradley 1336-PB-SP2C Retrofit-Ready Power Base for 1336 PLUS Overview

Allen-Bradley 1336-PB-SP2C Retrofit-Ready Power Base for 1336 PLUS Control Systems

The Allen-Bradley 1336-PB-SP2C (part number 74101-502-57) is a power base board engineered for the 1336 PLUS series of AC variable frequency drives. As legacy 1336 PLUS installations approach end-of-service milestones, this power base board has become a critical retrofit and replacement component for facilities seeking to extend drive life, restore failed units, or execute a controlled migration to newer Rockwell Automation drive platforms. SMARTNEXMSK maintains verified stock of the 1336-PB-SP2C, fully tested and backed by a 12-month warranty, ready for immediate dispatch to global destinations.

Upgrade Compatibility Table

Parameter Details
Compatible Drive Series Allen-Bradley 1336 PLUS (1336S), 1336 PLUS II (1336F)
Part Number 1336-PB-SP2C / 74101-502-57
Mounting Interface Standard 1336 PLUS drive chassis backplane; direct bolt-in replacement
Power Input Compatibility Verify drive frame size and input voltage rating (200–240 V or 380–480 V AC) before installation
Communication Compatibility Compatible with 1336-GM-1 (DeviceNet), 1336-GM-2 (Remote I/O), and 1336-GM-3 (DH+) communication option cards
Replacement Recommendation Direct drop-in for failed or degraded OEM power base; no firmware change required
Commissioning Notes Verify DC bus capacitor condition, gate driver signals, and thermal interface before power-up
Warranty 12 months from date of shipment; covers manufacturing defects and functional failure

Retrofit Planning for Existing Automation Systems

Replacing the 1336-PB-SP2C in a live production environment requires systematic pre-work to avoid extended downtime and protect existing program logic. Before removing the failed power base, engineers should document the full drive configuration using the 1336-HIM-A3 or 1336-HIM-A4 Human Interface Module, capturing all parameter groups including acceleration/deceleration ramps, current limits, speed references, and fault history. If the HIM is unavailable or damaged, parameters can be uploaded via the 1336-GM-3 DH+ communication card using RSLogix 5 or RSLogix 500 connected to the host PLC — typically a 1785-L40B PLC-5 or SLC 500 5/04 processor in legacy panel configurations.

Terminal wiring on the 1336 PLUS power base follows a defined layout for control power (TB1), motor output (T1/T2/T3), and line input (L1/L2/L3). Before disconnecting, photograph or sketch the existing wiring, paying particular attention to any external brake resistor connections routed through the 1336-MOD-HA2 dynamic braking module. Verify that the replacement 1336-PB-SP2C matches the original frame size — Frame B, C, D, or E — as the physical dimensions and bus bar positions differ between frames.

For systems using the 1336-GM-1 DeviceNet communication card, confirm the node address DIP switch settings on the option card before removal. DeviceNet node conflicts after reinstallation are a common commissioning error that can prevent the drive from appearing on the network scan list in RSNetWorx for DeviceNet. Similarly, if the panel includes a 1336-GM-2 Remote I/O adapter, verify the rack address and starting quarter settings match the original scanner configuration in the PLC-5 rack.

I/O wiring connected to the 1336 PLUS control terminal strip — including analog speed reference signals (0–10 V or 4–20 mA), digital run/stop commands, and fault relay outputs — should be labeled and photographed before disconnection. The 1336-PB-SP2C replacement does not alter the control terminal layout, so rewiring is straightforward, but polarity and signal type must be confirmed against the original drive nameplate and wiring diagram. Where the original wiring diagram is unavailable, the 1336 PLUS User Manual (publication 1336 PLUS-5.0) provides the full terminal reference.

Panels that include a 1336-BRF-SP1 brake resistor assembly or a 1336-MOD-HA2 dynamic braking module should have the braking circuit verified independently after power base replacement, as thermal damage to the power base is frequently accompanied by degraded braking IGBT performance. In multi-drive cabinets sharing a common DC bus, the 1336-BUS-SP1 bus bar kit condition should also be inspected before energizing the replacement board.

All replacement units supplied by SMARTNEXMSK are functionally tested prior to shipment. Each 1336-PB-SP2C is verified for gate drive signal integrity, DC bus charging circuit operation, and control power output before packaging. Units are shipped with anti-static protection and include a test report. The 12-month warranty covers functional failure under normal operating conditions and excludes damage caused by incorrect installation, overvoltage events, or environmental contamination.

Downtime Control During System Migration

Minimizing production downtime during a 1336 PLUS power base replacement depends on preparation quality and the availability of a pre-tested spare. SMARTNEXMSK recommends the following sequence to protect program logic and maintain field control continuity:

Step 1 — Parameter Backup: Upload all drive parameters to the 1336-HIM-A3 or via DH+ to the host controller before any hardware is disturbed. Confirm the backup is complete and readable. If the drive is non-responsive, note all nameplate data and reconstruct parameters from the original commissioning sheet.

Step 2 — Safe Isolation: Follow LOTO (Lockout/Tagout) procedures. Confirm DC bus voltage has discharged below 50 V DC using a calibrated meter before touching any internal components. The 1336 PLUS DC bus can retain dangerous charge for several minutes after AC power removal.

Step 3 — Controlled Swap: Remove the failed 1336-PB-SP2C, install the replacement, and reconnect all wiring per the documented layout. Torque all power terminals to specification — undertorqued connections are a leading cause of premature failure in high-current drive applications.

Step 4 — Recommissioning: Restore parameters from backup. Perform a no-load motor rotation test before reconnecting the mechanical load. Verify fault relay outputs are functioning and that the PLC or DCS receives the correct drive status signals before returning the system to automatic mode.

For facilities running continuous processes, SMARTNEXMSK can support pre-shipment parameter matching and expedited dispatch to reduce the window between failure and restoration. Contact our technical team at [email protected] to discuss your specific retrofit timeline.

Retrofit Support FAQ

Q1: Is the 1336-PB-SP2C a direct replacement for all 1336 PLUS drive frames?
A: No. The 1336-PB-SP2C is frame-specific. Confirm your drive’s frame size (B, C, D, or E) from the drive nameplate before ordering. SMARTNEXMSK can assist with frame identification if you provide the full drive catalog number and nameplate voltage/current ratings.

Q2: Will I need to reprogram the drive after replacing the power base?
A: The power base board does not store drive parameters — these are held in the control board (1336-PB-SP2C does not include the control board). If the control board is intact and undamaged, all parameters are preserved. If the control board was also replaced or reset, parameters must be restored from a backup or re-entered manually.

Q3: What commissioning checks are required after installation?
A: Verify DC bus charging, gate driver signal output, control power rail voltages (+15 V, -15 V, +5 V), and motor output phase balance under no-load conditions. Confirm all communication option cards (DeviceNet, DH+, Remote I/O) are recognized by the network after power-up. Check fault log for any power-up diagnostics before enabling the run command.

Q4: What does the 12-month warranty cover?
A: The warranty covers manufacturing defects and functional failure under normal operating conditions for 12 months from the date of shipment. It does not cover damage resulting from incorrect installation, reverse polarity, overvoltage transients, environmental contamination (moisture, conductive dust), or mechanical impact. All warranty claims are processed through [email protected] with a fault description and photographic evidence.


© 2026 SMARTNEXMSK. All rights reserved.
Original Source: https://smartnexmsk.com
Contact: [email protected] | +86 18259474341

Catalog Paths

Continue from this exact model

Use the live catalog paths below to compare the same brand, product type, or series before sending your RFQ.

RFQ Intent Desk

Choose the right sourcing path for this model

Each action carries the product model and intent into the inquiry record so the sales follow-up starts with useful context.

Exact Model Quote

Use this path when the SKU, brand, quantity, and destination are already confirmed.

Start
Replacement Check

Use this path for old, obsolete, or uncertain models that need compatibility review.

Start
Quality Confirmation

Ask for label photos, packing notes, documentation, or pre-shipment checks.

Start
Urgent Dispatch

Route downtime or maintenance requests with target dispatch timing and courier country.

Start
Request Quote WhatsApp Email