Allen-Bradley 1336T-MCB-SP34B Retrofit-Ready Control Board for 1336 PLUS II Control Systems
The Allen-Bradley 1336T-MCB-SP34B (Part No. 74101-772-54) is the main control board designed for the 1336 PLUS II series AC variable frequency drives. As legacy 1336 PLUS II installations approach end-of-service milestones, this board serves as the definitive retrofit-ready replacement — enabling plant engineers and system integrators to restore full drive functionality without replacing the entire drive chassis, rewiring the control cabinet, or rewriting existing PLC ladder logic.
Whether you are recovering from an unplanned drive fault, executing a scheduled control system upgrade, or sourcing a long-lead discontinued spare, the 1336T-MCB-SP34B provides a verified, wiring-compatible solution backed by a 12-month warranty and pre-shipment functional testing.
Upgrade Compatibility Table
| Parameter | Details |
|---|---|
| Compatible Drive Series | Allen-Bradley 1336 PLUS II (all frame sizes) |
| Part Number | 1336T-MCB-SP34B / 74101-772-54 |
| Replaces / Supersedes | 1336T-MCB-SP34A, 1336T-MCB-SP33, earlier MCB revisions |
| Backplane Interface | Standard 1336 PLUS II internal bus connector — direct plug-in replacement |
| Communication Compatibility | Compatible with 1336-GM1 (DeviceNet), 1336-GM2 (Remote I/O), 1336-GM6 (ControlNet) communication adapter modules |
| Terminal Wiring | Retains original TB1/TB2 terminal block layout; no rewiring required for standard analog/digital I/O |
| Installation Requirement | Drive must be de-energized; observe ESD precautions; verify firmware revision compatibility before power-up |
| Retrofit Recommendation | Recommended for drives with fault codes F002, F005, F012, F048 traced to MCB failure |
| Commissioning Notes | Re-enter motor nameplate parameters; verify accel/decel ramp settings; confirm analog reference scaling |
| Warranty | 12 months from date of shipment; covers manufacturing defects under normal operating conditions |
Retrofit Planning for Existing Automation Systems
Successful integration of the 1336T-MCB-SP34B into an existing control system requires a structured pre-retrofit assessment. Before removing the failed board, document all drive parameters using a 1336-MOD-L2E HIM (Human Interface Module) or upload the parameter file via DriveExplorer software connected through the drive’s DPI port. This preserves motor tuning data, speed reference scaling, and fault history — critical information that would otherwise be lost during board replacement.
Inspect the 1336 PLUS II power structure before installation. Verify that the DC bus capacitors, gate driver board, and IGBT modules are within specification, as a shorted output stage is frequently the root cause of MCB failure. Installing a new control board into a drive with an unresolved power fault will result in immediate re-failure. Check the 1336T-PS-SP1 precharge board and associated snubber circuits as part of the same service event.
For drives communicating over Remote I/O (RIO) via the 1336-GM2 adapter, confirm that the rack address DIP switches on the communication module are correctly set before power-up. Drives integrated into a ControlLogix or PLC-5 rack via 1771 I/O backplane should have their rack configuration verified in RSLogix 5 or RSLogix 500 to prevent address conflicts during restart. If the system uses a 1336-GM6 ControlNet adapter, re-commission the node address and verify the network schedule in RSNetWorx for ControlNet.
Panel-level considerations include verifying that the 24 VDC control power supply feeding the drive’s logic section is within tolerance (typically ±10%). Undersized or aging control power supplies are a common secondary failure point in older 1336 PLUS II installations. Similarly, inspect the 1336-BRF brake resistor wiring and thermal protection circuit if dynamic braking is part of the application.
For multi-drive systems sharing a common MCC (Motor Control Center) bus, coordinate the retrofit sequence to avoid simultaneous de-energization of drives controlling critical process loads. Where the 1336 PLUS II drives interface with a PanelView 550 or PanelView 600 HMI over DH-485 or DF1, verify that the HMI communication parameters (baud rate, node address, protocol) are unchanged after board replacement — the new MCB retains these settings in non-volatile memory only if the parameter backup procedure was completed prior to removal.
If the retrofit is part of a broader migration from 1336 PLUS II to PowerFlex 40 or PowerFlex 400 drives, note that the terminal block pinout and parameter structure differ significantly. In such cases, the 1336T-MCB-SP34B serves as a bridge solution — restoring immediate production capability while the full drive replacement project is engineered and scheduled.
Downtime Control During System Migration
Unplanned drive failures in continuous-process environments demand a rapid, structured response. The 1336T-MCB-SP34B is stocked for same-day or next-business-day dispatch, minimizing the gap between fault identification and parts availability — typically the longest phase of an unplanned outage.
To protect existing program logic during the replacement, ensure that the PLC controlling the drive — whether a SLC 500, MicroLogix 1500, or ControlLogix L6x — remains in RUN mode with the drive in a faulted/disabled state rather than powering down the entire control panel. This preserves the active program in processor memory and keeps field I/O states visible to the operator. Use the HIM or a laptop running DriveExplorer with a 1203-USB DPI-to-USB cable to upload the drive parameter file before disconnecting the MCB.
After installing the 1336T-MCB-SP34B, perform a controlled no-load test: enable the drive at minimum frequency (typically 5–10 Hz), verify output voltage symmetry across all three phases using a true-RMS meter, and confirm that the drive responds correctly to speed reference signals from the PLC analog output module. Only after this verification should the motor be reconnected and the system returned to automatic control.
For facilities with a documented LOTO (Lockout/Tagout) procedure, ensure that the MCB replacement is performed under an approved electrical work permit. Pre-shipment functional testing of each 1336T-MCB-SP34B unit — conducted under load conditions before dispatch — reduces the risk of installing a second defective board and extends the outage further.
Retrofit Support FAQ
Q1: Is the 1336T-MCB-SP34B a direct drop-in replacement for earlier MCB revisions such as the SP34A or SP33?
In most cases, yes. The SP34B revision is backward-compatible with the SP34A and SP33 within the 1336 PLUS II drive family. However, always cross-reference the drive’s nameplate catalog number and firmware revision against the compatibility matrix in Allen-Bradley Bulletin 1336 service documentation (Publication 1336 PLUS II-6.5.1) before installation. If the drive was manufactured before 1998, contact our technical team to confirm revision compatibility.
Q2: What commissioning steps are required after installing the replacement board?
After physical installation, restore the parameter file from your pre-removal backup using DriveExplorer or the HIM upload function. Verify motor nameplate data (voltage, current, frequency, RPM), re-enter application-specific parameters (accel/decel times, speed limits, analog scaling), and perform a no-load run at low speed before reconnecting the driven load. If the drive communicates via DeviceNet or ControlNet, re-verify the node address and network health before returning to automatic mode.
Q3: How do I verify that the MCB is the failed component and not the gate driver or power section?
Isolate the MCB by checking for active fault codes: F002 (RAM fault), F005 (EEPROM fault), F012 (control board hardware fault), and F048 (parameter checksum error) are strong indicators of MCB failure. If the drive displays no fault codes but fails to power up the control section, measure the 5 VDC and 15 VDC logic supply rails on the MCB connector. Absence of these voltages with a healthy power supply input points to MCB failure. Gate driver and IGBT faults typically present as F007 (overcurrent) or F022 (ground fault) with corresponding phase-loss symptoms.
Q4: What does the 12-month warranty cover, and what is the return process?
The 12-month warranty covers manufacturing defects and functional failures under normal operating conditions from the date of shipment. It does not cover damage caused by incorrect installation, overvoltage events, moisture ingress, or physical impact. To initiate a warranty claim, contact [email protected] with your order number, a description of the fault symptoms, and any available fault code history. A return merchandise authorization (RMA) will be issued within one business day, and a replacement or repaired unit will be dispatched upon receipt and inspection of the returned board.
© 2026 SMARTNEXMSK. All rights reserved.